Mountain Rest bridge closed indefinitely

The state has closed a secondary-258 bridge in Mountain Rest for repairs.  The DOT says a time frame to reopen the Chattooga Ridge Road bridge has yet to be determined.  For the 175 daily traffic volume that crosses the bridge, there are two detour routes for both east and westbound traffic.  The average detour length is measured at nearly 12.5 miles.