New guardrail preliminary to re-paving
Roadside construction signs have gone up on the side roads leading to a section of SC 11 that is scheduled for re-surfacing. However, the work that starts today between Collins Road and Critter Road will be new guardrail. Officials say don’t expect the re-surfacing of the roadway to start until after winter, around spring time. Re-paving 11 from Collins Road south to Critter Road is one of three contract jobs, as part of a package of work, issued to King Asphalt of Liberty by the South Carolina DOT.